Posts Tagged: buoy maintenance

Bringing home the buoys

Bringing home the buoys

An Eastland Port telemetric buoy weighing 300kg and normally attached to the seabed via a two-tonne concrete mooring block was brought in for routine maintenance last week. This pictured buoy captures swell height, direction and period data for the port and public to use. It was recovered using the tug Titirangi and work boat Turanganui…. Read more »