At Eastland Port we need to get ready for the huge amount of wood coming out of our local forests.
We’ve been growing side-by-side with forestry and can handle 2.9 million tonnes of wood per year. But in future this volume will nearly double.
We also want to future-proof the port for coastal shipping and new international trade and exports. We’ve looked at the range of options and the best solution is to be able to park two 200m long ships in the port at the same time.
Read more at www.twinberth.nz

